North South Rail Link
  • A Region Divided Connectivity Capacity Equity Efficiency Sustainability Competitiveness Why Now
  • Alignment Construction Equipment
  • Projects Overview Zurich - Durchmesserlinie Malmo - Citytunneln Leipzig - City-Tunnel Stockholm - Citybanan Ottawa - Confederation Line Gothenburg - Vastlanken London - Crossrail London - Jubilee Extension Oslo - Follo Line New York - East Side Access Philadelphia - Center City Commuter Connection Cambridge & Somerville - Red Line Extension
  • Legacy of Bold Investments Two Terminals Rise And Fall Of Highways Land Use Impacts
  • Connect FAQ Learn More News Supporters About

North South Rail Link

  • Purpose & Need/
    • A Region Divided
    • Connectivity
    • Capacity
    • Equity
    • Efficiency
    • Sustainability
    • Competitiveness
    • Why Now
  • Design & Construction/
    • Alignment
    • Construction
    • Equipment
  • Comparable Projects/
    • Projects Overview
    • Zurich - Durchmesserlinie
    • Malmo - Citytunneln
    • Leipzig - City-Tunnel
    • Stockholm - Citybanan
    • Ottawa - Confederation Line
    • Gothenburg - Vastlanken
    • London - Crossrail
    • London - Jubilee Extension
    • Oslo - Follo Line
    • New York - East Side Access
    • Philadelphia - Center City Commuter Connection
    • Cambridge & Somerville - Red Line Extension
  • Brief History/
    • Legacy of Bold Investments
    • Two Terminals
    • Rise And Fall Of Highways
    • Land Use Impacts
  • Next Steps/
    • Connect
    • FAQ
    • Learn More
    • News
    • Supporters
    • About
Central Artery Construction 1954b.png

North South Rail Link

Integrated Regional Rail

Rise And Fall Of Highways

North South Rail Link

  • Purpose & Need/
    • A Region Divided
    • Connectivity
    • Capacity
    • Equity
    • Efficiency
    • Sustainability
    • Competitiveness
    • Why Now
  • Design & Construction/
    • Alignment
    • Construction
    • Equipment
  • Comparable Projects/
    • Projects Overview
    • Zurich - Durchmesserlinie
    • Malmo - Citytunneln
    • Leipzig - City-Tunnel
    • Stockholm - Citybanan
    • Ottawa - Confederation Line
    • Gothenburg - Vastlanken
    • London - Crossrail
    • London - Jubilee Extension
    • Oslo - Follo Line
    • New York - East Side Access
    • Philadelphia - Center City Commuter Connection
    • Cambridge & Somerville - Red Line Extension
  • Brief History/
    • Legacy of Bold Investments
    • Two Terminals
    • Rise And Fall Of Highways
    • Land Use Impacts
  • Next Steps/
    • Connect
    • FAQ
    • Learn More
    • News
    • Supporters
    • About

The Rise And Fall Of Highways And Prior Attempts to Create a Rail Link

After World War II, fueled by federal investment, highway expansion began in earnest. In the early 1950’s a transportation corridor between North and South Stations was indeed created, but for cars, not trains - and running through the city not in tunnel but rather on elevated viaducts.

The Central Artery in 1964   [Boston Globe, June 10, 1964]

Within just a few years of its completion the devastating urban impact of the elevated highway was apparent, and plans began to be formulated for its removal. By the late 1970’s during the administration of Gov. Michael Dukakis, the plan took concrete shape, with a pair of rail lines running down the middle.

In March 1987 President Reagan vetoed funding for the Central Artery Project, specifically citing the inclusion of a rail connection. In the battle to overturn this veto and secure funding for the project (by just one vote), the rail link was sacrificed.

From its inception in 1978 until President Reagan vetoed funding for it in 1986, a two track rail link was a key part of the Central Artery Project, as shown here in Figure 47 of the Central Artery / I-93 Corridor Central Area Planning Study, August 1978   [© Massachusetts DPW, courtesy MIT library]

In 1993 Gov. William Weld commissioned a Central Artery Rail Link Task Force to find a way to reintroduce the rail connection into the project. The CARL Task Force developed a plan to build a rail tunnel directly below the Artery highway tunnels, using the Artery slurry walls to simplify the construction. This was released in March 1993. A month later the US Senate approved funding for a more detailed engineering and environmental study, which took place from 1995 – 2003.

This drawing shows the proposed intermodal connections to the Orange and Green Lines at North Station as proposed by the CARL Task Force.   [CARL Task Force / Brad Bellows Architects]

This study, undertaken by Vanasse Hangen Brustlin (VHB), built a firm case for the project, but it was again undermined by the ballooning costs of the Artery. In early 2003, when the NSRL analysis was nearly complete, Gov. Mitt Romney suspended work on the project. The Federal Transit Administration ordered the work to be filed as a Major Investment Study for future use.

The removal of the elevated Central Artery, completed in 2006, has been a great boon to the City of Boston.

The burial of the Central Artery despite its massive cost, has had a transformative impact on downtown Boston, but the work of linking our regional transportation system, for the benefit of the entire region, remains incomplete.   [hellogreenway 4/10/08, via Wikipedia]

But without the originally-intended rail link, the entire region remains trapped in highway gridlock, with our regional rail networks operating at a fraction of their potential capacity.

In 2014, the Massachusetts Legislature wisely authorized funding for the updating and completion of the North South Rail Link DEIR. For a host of reasons, it is essential that this work be resumed and completed immediately.

Five years after the completion of the world's most expensive highway project, and in the absence of adequate transit improvements, the region's major north-south highway remains gridlocked in both directions.   [© Boston Herald Staff Photo by Matt Stone, 11/21/2012]


Click on arrows on either side of the picture.  Read along at the bottom of each picture. 

Central Artery under construction, looking north

Central Artery under construction, looking north

[© Leslie Jones, ca. 1955]

Central Artery, 1964

Central Artery, 1964

After more than eight years of construction, the Central Artery and the Southeast Expressway were joined together on June 25, 1959, when both expressways finally opened to traffic. During its first day of operation, some 60,000 vehicles used the new six-lane Central Artery.  The first traffic jam was recorded only three months after completion.   [Boston Globe, June 10, 1964

CATP Planning Study-cover

CATP Planning Study-cover

[Massachusetts DPW, 1978]

CATP Planning Study – figure 3, p 92

CATP Planning Study – figure 3, p 92

[Massachusetts DPW, 1978]

 From its inception in 1978 until President Reagan vetoed Federal funding for it in March 1987, the project included a 2-track rail link running down the center

From its inception in 1978 until President Reagan vetoed Federal funding for it in March 1987, the project included a 2-track rail link running down the center

[Massachusetts DPW, 1978]

1978 Central Area Planning Study excerpt

1978 Central Area Planning Study excerpt

The 1978 Central Area Planning Study made clear that intermodal connections between commuter rail and transit lines was a key part of the project.   [Central Area Planning Study, Aug. 1978]

1978 Central Area Planning Study excerpt

1978 Central Area Planning Study excerpt

The North South rail connection was "a principal component" in all reconstruction options developed in the 1978Central Area Planning Study.   [Central Area Planning Study, Aug. 1978]

North Station intermodal connection detail

North Station intermodal connection detail

In early 2003, Governor Weld created a Central Artery Rail Link Task Force to figure out how to restore the rail link that had been lost in the 1987 veto. The CARL Task Force proposed extending the Artery slurry walls to create an earth support system for the rail link directly below the Artery. This drawing shows the proposed intermodal connections to the Orange and Green Lines at North Station.   [CARL Task Force / Brad Bellows Architects]

Boston Globe article about rail link, June 24 1993

Boston Globe article about rail link, June 24 1993

The CARL Task Force report was issued in May 1993, and one month later the US Senate authorized $4M for a more detailed engineering and environmental study of the rail link.   [© The Boston Globe, June 24, 1993]

Boston Globe article, July 10, 1993

Boston Globe article, July 10, 1993

A few weeks later, Governor Weld committed additional state funds to advancing the North South Rail Link.   [The Boston Globe, July 10, 1993]

The Boston Globe, by Tom Palmer, February 15, 2000

The Boston Globe, by Tom Palmer, February 15, 2000

By early 2000, the Big Dig's cost was spinning out of control and casting a long shadow over other large infrastructure projects, however valuable.   [The Boston Globe, February 15, 2000]

Notice of EIS cancellation

Notice of EIS cancellation

Governor Romney took office in January 2003. Within a few months, the MBTA informed the Federal Transit Authority that due to limited financial resources, it would forego work on the NSRL. The FTA suspended the EIS/EIR process that had begun in 1995, and recommended that the results be compiled as a Major Investment Study "to serve as a foundation for a subsequent EIS".   [Government Printing Office]

Boston Globe article on Ceiling Collapse

Boston Globe article on Ceiling Collapse

The Big Dig's cost overruns and quality control problems, which included leaking slurry walls, and the collapse of concrete ceiling panels that killed a motorist in 2006, undermined public confidence in the state's ability to effectively manage large infrastructure projects.   [© The Boston Globe]

Boston Globe article about Big Dig cost

Boston Globe article about Big Dig cost

By 2008, the cost of the Central Artery Project had ballooned to $22 Billion, casting a long shadow over other needed infrastructure investments and casting doubt on the Commonwealth's ability to manage such projects.   [The Boston Globe, 7/17/08]

Big Dig Red Ink Engulfs State

Big Dig Red Ink Engulfs State

[© The Boston Globe / David Butler, July 17, 2008]

Aerial view of Greenway

Aerial view of Greenway

The burial of the Central Artery despite its massive cost, has had a transformative impact on downtown Boston, but the work of linking our regional transportation system, for the benefit of the entire region, remains incomplete.   [hellogreenway 4/10/08, via Wikipedia]

Route 128 traffic

Route 128 traffic

Congestion on Route 128 paralyzes Boston's outer suburbs for several hours a day.   [© The Boston Globe, staff photo by John Tlumacki (published 1/12/12)]

Traffic on the Southeast Expressway looking northbound

Traffic on the Southeast Expressway looking northbound

Five years after the completion of the world's most expensive highway project, and in the absence of adequate transit improvements, the region's major north-south highway remains gridlocked in both directions.   [© Boston Herald Staff Photo by Matt Stone, 11/21/2012]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Previous Next
Central Artery under construction, looking north
Central Artery, 1964
CATP Planning Study-cover
CATP Planning Study – figure 3, p 92
 From its inception in 1978 until President Reagan vetoed Federal funding for it in March 1987, the project included a 2-track rail link running down the center
1978 Central Area Planning Study excerpt
1978 Central Area Planning Study excerpt
North Station intermodal connection detail
Boston Globe article about rail link, June 24 1993
Boston Globe article, July 10, 1993
The Boston Globe, by Tom Palmer, February 15, 2000
Notice of EIS cancellation
Boston Globe article on Ceiling Collapse
Boston Globe article about Big Dig cost
Big Dig Red Ink Engulfs State
Aerial view of Greenway
Route 128 traffic
Traffic on the Southeast Expressway looking northbound
 